Built to deliver on time, every run.
Standard capacity of 3,500 units a month, scalable for programme runs, with a standard 15-day lead time for up to 500 units.
How a project moves
Six steps, with the times we already publish
Durations are the ones on the capacity page. Steps without a duration are the path, not a new promise.
-
Brief
You share the garment, quantity, deadline and any artwork.
-
Design and tech pack
Patterns, grading and a tech pack. Designs are digitised with CAD.
-
Sample
A sample garment before the bulk cut.
-
Approval
You sign off the sample. Changes happen before bulk production.
-
15 days, up to 500 units
Bulk production
The published standard once the sample is approved. Smaller quantities are usually quicker than 15 days.
-
3 to 5 days regionally
QA, packing, delivery
Inspection, packing and delivery after production.